Milwaukee 9561 Car Stereo System User Manual


 
Milwaukee Electric Tool Corporation
13135 West Lisbon Road
Brookfield, Wisconsin 53005
TEL: (800) 729-3878
15
INSPECTOR’S REPORT
ITEM REMARKS (LIST DEFICIENCIES AND RECOMMENDED ACTION)
Inspector’s Date
Signature Inspected Approved by Date
Figure 10B — Recommended Inspector’s Report
NOTE: All bearings except hook and idler sheave bearings are prelubricated and sealed.
(*) This lubrication schedule is based on a hoist operating in normal environment conditions. Hoists operating in adverse
atmospheres containing excessive heat, corrosive fumes or vapors, abrasive dust, etc., should be lubricated more frequently.
Figure 11 — Recommended Lubrication Schedule
RECOMMENDED LUBRICATION SCHEDULE*
MILWAUKEE
ELECTRIC POWERED CHAIN HOIST
PAGE AND COMPONENT TYPE OF LUBRICANT TYPE OF SERVICE AND
REFERENCE NO. FREQUENCY OF LUBRICATION
HEAVY NORMAL INFREQUENT
Figure 20
Load Chain SAE 90 gear oil Daily Weekly Monthly
Ref.No.18
Figure 19 Gearing SAE 90 extreme pressure gear oil At periodic inspection (See Figure 10A)
Figure 17 Limit Switch Shaft General purpose spray lubricant
Monthly Yearly Yearly
Ref.No.9
Figure 20
Ref.No.38, 50
Load Hook Bearing SAE 30 gear or motor oil Weekly Monthly Yearly
NLGI #2 multi-purpose
Figure 20 Idler Sheave Bearing
lithium base grease At periodic inspection (See Figure 10A)
Ref.No.44 (Bushing) Assembly