A SERVICE OF

logo

Wall Mount ZV830
Installation Heights
Actual *Possible
Ceiling *Possible VENTED RECIRCULATING
Height Installation Height Installation Height
711 24 24
80 24to 25 24to 25
81 24to 26 24to 26
82 24to 27 24to 27
83 24to 28 24to 28
84 24to 29 24to 29
85to 96
24to 30 24to 30
97 25to 30 24to 30
98 26to 30 24to 30
99 27to 30 24to 30
910 28to 30 24to 30
911 29to 30 25to 30
100 30 26to 30
101 24to 30 27to 30
102 24to 30 28to 30
103 24to 30 29to 30
104 24to 30 30
97 24 24to 30
98 24to 25 24to 30
99 24to 26 24to 30
910 24to 27 24to 30
911 24to 28 24
100 24to 29 24to 25
101 24to 30 24to 26
102 24to 30 24to 27
103 24to 30 24to 28
104 24to 30 24to 29
105 24to 30 24to 30
106to 24to 30 24to 30
116
117 25to 30 24to 30
118 26to 30 24to 30
119 27to 30 24to 30
1110 28to 30 24to 30
1111 29to 30 25to 30
120 30 26to 30
*Based on 36countertop height.
7
DETERMINE INSTALLATION HEIGHT
Telescopic duct covers are provided to conceal
the ductwork running to the ceiling.
This hood can be installed for recirculating
operation. No kits required.
NOTE: Installation height should be measured from
the cooking surface to the lowest part of the hood.
The vent hood must be installed 24
min. and
30
max. above the cooking surface. The hood
installation height, from the cooking surface to the
bottom of the hood, depends upon ceiling height.
Installation Preparation
24” Min.
30” Max.
36” Min.
ACCESSORIES:
ZX83012 Accessory duct cover is available for 10 ft.
to 12 ft. ceilings. This accessory consists of one
48
7
8long duct cover.
ACCESSORY ZX90010 SUPPLIED
ACCESSORY ZX83012