A SERVICE OF

logo

CONNECT DUCTWORK
Install ductwork, making connections in the
direction of airflow as illustrated.
Push duct over the exhaust outlet and damper.
Secure joints in ductwork with sheetmetal screws.
Wrap all duct joints and the flange connections
with duct tape for an airtight seal.
CAUTION:Do not use sheet metal screws
at the hood flange connection. Doing so will prevent
proper damper operation. Seal connection with
tape only.
PRUDENCE :
Il ne faut pas utiliser de vis autoraurdeuses à la
connexion du collet de la hotte. Ceci empêcherait
le bon fonctionnement du registre. N’utiliser que du
ruban adhésif pour assurer l’étanchéité du raccord.
7
Duct tape
over seam
and screw
Screw
Airflow
Installation Instructions
INSTALLATION—VENTED TO THE OUTSIDE
12
MOUNT THE HOOD
WARNING:2 people are required to lift and
position the hood onto the mounting bracket.
AVERTISSEMENT :
If faut deux personnes pour lever et mettre en place
la hotte sur le support de montage.
Lift the hood onto the mounting bracket.
• Position a spirit level at the bottom of the hood to
check side to side leveling.
5
LEVEL THE HOOD
This hood has built-in levelers on the mounting hooks
at each side. Use a long Phillips screwdriver from the
front to access the levelers.
Use the top screw hole in the leveler to raise or lower
the hood on that side.
Use the bottom screw hole to pull the hood tight
against the wall surface.
Mark hole location at the bottom of the hood.
Remove the hood. If the bottom screw hole does not
enter a stud, enlarge the hole to 3/8and install wall
fastener anchors.
Place the hood back onto the mounting bracket,
check level again and install the wall fastener.
6
Screw hole
Levelers