
FM5 Operator’s Manual Prepare - 29
Prepare Jobsite
CMW
Prepare Jobsite
Install Fluid Unit
Consider Load Requirements
Installation Tips
• Drill holes through trailer cross members to provide adequate connection to trailer structure, not just
deck boards.
• Use high-quality, properly-sized mounting hardware.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
NOTICE:
• If jobsite classification is in question or if the possibility of unmarked electric utilities exists, classify
jobsite as electric.
• Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
• All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
IMPORTANT: The FM5 unit must be installed on a trailer or truck that meets the following requirements.
• All trailer or truck components including axles and tires are in good condition.
• Axle loads meet US requirements. In countries other than the US, check local regulations.