![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/3/8d/38d56254-54fe-46e3-85ae-d3f5260e1091/38d56254-54fe-46e3-85ae-d3f5260e1091-bg138.png)
FX Series Programmable Controllers Execution Times And Instructional Hierarchy 7
7-12
7.3 Hierarchical Relationships
Of Basic Program Instructions
The followin
table identifies an 'inclusive
relationship'. This means the secondar
pro
ram
construction is included within the complete
operatin
boundaries of the primar
pro
ram
construction, e.
.:
:Instruction combination is acceptable - for restrictions see appropriate note
: Instruction combination is not allowed - bracketed number is the error code
: Instruction combination is not recommended for use even thou
h there is no operational
error
The combination of instructions with an 'inclusive relationship' is allowable. However please be
aware of the followin
exceptions:
1) MC-MCR and STL-RET constructions cannot be used within FOR-NEXT loops, P-SRET or
I-IRET subroutines.
2) Pro
ram flow ma
not be discontinued b
usin
an
of the followin
methods while inside
MC-MCR, FOR-NEXT, P-SRET, I-IRET pro
ram constructions, i.e. usin
interrupts (I),
IRET, SRET, FEND or the END instruction is not allowed.
Primary
Program
Construction
Secondary program construction
MC-MCR CJ - P EI - DI
FOR -
NEXT
STL -
RET
P - SRET I - IRET
FEND -
END
MC - MCR
- 8
nest lev-
els
-
6608
-
6608
-
6608
CJ - P
-
6701
EI - DI
FOR - NEXT
-
6607
- 5
nest lev-
els
-
6607
-
6607
-
6607
-
6607
STL - RET
-
6605
-
within 1
STL step
-
6605
-
6605
-
6605
P - SRET
-
6606
-
6606
-
6606
-
6606
-
6709
I - IRET
-
6606
-
6606
-
6606
-
6606
-
6606
FEND - END
0 - FEND
-
6606
-
6606
0 - END
(no FEND)
-
6606
-
6606
FOR
EI
DI
NEXT
Primary
program construction
Secondary
program construction