A SERVICE OF

logo

DCA20SPXU2 SERVPRO
®

GENERATOR SHUT-DOWN PROCEDURES


Before connecting this generator to any
building’s electrical system, a 
electrician must install an
 Serious damage to
the building’s electrical system may occur
without this transfer switch.
NOTICE
When connecting the generator to a isolation (transfer)
switch,  have power applied to the generator’s
internal battery charger. This will ensure that the engine
will not fail due to a dead battery
NOTICE
When the MPEC control switch is placed in the 
mode, the generator will  in the
event of commercial power falling below a prescribed
level by means of a contact closure that is generated
automatically by a transfer switch.
In this position (, should an outage occur, the
automatic transfer switch (ATS) will start the generator
automatically via the generator's auto-start contacts
connected to the ATS's start contacts.
Please refer to your ATS installation manual for further
instructions for the correct installation of the auto-start
contacts of the generator to the ATS.

When running the generator in the  mode,
remember the generator can start up at any time without
warning.  attempt to perform any maintenance
when the generator is in the auto mode.
1. Place the  (Figure 37) in the
 position.
Figure 37. MPEC Control Switch (AUTO)
2. Continue operating the generator as outlined in the
Manual Start-up procedure (start at step 2).
AUTO
MANUAL
OFF/RESET