• To assemble the D-RING CABLE (102) follow the cable routing as shown and use the following steps:
Screw one of the threaded ends of the D-RING CABLE (102) approximately 1” into the end of the SELECTOR SHAFT (73) of the HEAD
PLATE (72) as shown in FIGURE 35.
Route the CABLE (102) up and over the two PULLEYS in the TOP BOOM (17) above the WEIGHT STACK. (Remove pulleys
for ease of installation.)
Screw the other threaded end of the D-RING CABLE (102) approximately 1” into the end of the shaft on the D-RING (7) as shown in
FIGURE 35.
SECURELY tighten two pulley connections from the previous step.