A SERVICE OF

logo

STEP 22
Wrap the PEC DEC CABLE (24) around one 3-1/2" PULLEY
(23) and assemble the PULLEY to the PULLEY BRACKET
(1 l) using one 3/g X 2" BOLT (29) and one 3/8" LOCKNUT
(36) as shown in HGUR~ 22.
3
FIGURE 22
FIGURE 23
STEP 23:
¯
Insert each end of PEC CABLE (24) into the bushings on the cams of the LEFT (15) & RIGHT (].4) PEC AI~IS, then drape
CABLE over the PULLEYS assembled to the CENTER PULLEY BRACKET (16). See FIGURE 23 & 893103 CABLE DIA-
GRAM on PAGE 12.
¯
After CABLE (18) has been routed over the PULLEYS on the CENTER PULLEY BRACKET (16), position CABLE RET.A~N-
ING CLIPS (56) at a
°
angle over th e PULLEYS and SECURELY tighten.
o [ ! I !
I I
16