A SERVICE OF

logo

121
MAINTENANCE
Adjustment Procedure (cont.)
5. Tighten eccentric clamp bolts to 45 ft. lbs. (6.21 kg/m). Check chain tension.
Gen II a nd III Models
1. Remove cotter pin and washer connecting brake pedal linkage to caliper actu-
ating arm. Remove linkage from arm.
2. Remove right front fender mud flap foot board attaching hardware.
3. Remove centerchain guard attaching hardware. Press brake pedaldownward
and remove guard.
4. Remove forward chain guard attaching bolts and guard.
5. Loosen center chain eccentric clamp bolts (A)
6. Rotate vehicle forward or rearward until a sprocket hole aligns with hole pro-
vided in eccentric.
7. Insert a large punch or screwdriver through gear and into eccentric hole. Ro-
tate vehicle rearward to tighten chain. Chain deflection should be 1/4-1/2
(.6-1.3 cm) with 18 lbs. (8.3 kg) of force at center of chain.
8. Tighten eccentric clamp bolts to 45 ft. lbs. (6.21 kg/m). Check chain tension.
9. Loosen forward chain eccentric clamp bolt (B). Install punch in front sprocket
as describedpreviouslyandadjustchain to1/4-1/2 (.6-1.3cm) deflectionwith
18 lbs. (8 kg) of force at center of chain.
10. Tighten forward eccentric clamp bolt to 45 ft. lbs. (6.21 kg/m). When this bolt
istightenedthe chaindeflection may change slightly. Check deflection and ad-
just again if needed.