13
108382
OWNER’S MANUAL
For more information, visit www.desatech.com
Pressure Testing Heater Gas
Connections
1. Open equipment shutoff valve (see Fig-
ure 15, page 12).
2. Open main gas valve located on or
near gas meter for natural gas or open
propane/LP supply tank valve.
3. Make sure control knob of heater is in
the OFF position.
4. Check all joints from equipment shutoff
valve to control valve (see Figure 16
or 17). Apply a noncorrosive leak de-
tection fluid to gas joints. Bubbles
forming show a leak.
5. Correct all leaks at once.
6. Light heater (see Operating Heater,
pages 14 through 16). Check all other
internal joints for leaks.
7. Turn off heater (see To Turn Off Gas to
Appliance, page 15).
INSTALLATION
Continued
WARNING: Failure to position
the parts in accordance with these
diagrams or failure to use only
parts specifically approved with
this heater may result in property
damage or personal injury.
INSTALLING LOGS
It is very important to install the logs exactly
as instructed. Do not modify logs. Only use
logs supplied with heater.
1. Place bottom log (#1) on grate to fit as
illustrated in Figure 18. Make sure open
areas of log set line up with burner ports
(see Figure 19). Log will fit securely
on chassis.
IMPORTANT:
Make sure
log does not cover any burner ports.
2. Facing front of unit, place top log (#2)
onto the pegs in the center of the bot-
tom log (see Figure 20).
3. Position log piece (#3) by aligning
holes on underside with remaining pegs
on bottom log (see Figure 21).
4. Place lava rock around base of heater.
CAUTION: After installation
and periodically thereafter, check
to ensure that no flame comes in
contact with any log. With the
heater set to High, check to see if
flames contact any log. If so, re-
position logs according to the
log installation instructions in this
manual. Flames contacting logs
will create soot.
O
F
F
P
I
L
O
T
O
N
H
I
L
O
Figure 18 - Installing Bottom Log (#1)
Figure 19 - Installing Log set (Top View)
Logs
Burner
Ports
Bottom Log (#1)
Burner
Chassis
Grate
Burner
Port
O
F
F
P
I
L
O
T
O
N
H
I
L
O
Figure 20 - Installing Top Log (#2)
Figure 21 - Installing Log Piece (#3)
Top Log
(#2)
Peg
Log Piece (#3)
Peg
Figure 17 - Checking Gas Joints for
Propane/LP Gas
Control Valve Location
Propane/LP
Supply Tank
Equipment
Shutoff Valve
Figure 16 - Checking Gas Joints for
Natural Gas
Gas Meter
Equipment Shutoff Valve
Control Valve
Location