Setup
Locate Reactor A-25
1. Locate Reactor A-25 on a level surface and bolt in
place to the floor with 3/8 in. (10 mm) bolts, unless
the Reactor needs to remain portable.
• Two bolts through the 2 in. (50 mm) deep caster
bushings in the rear.
• Two bolts through the 3-5/8 in. (168 mm) deep
caster bushings in the front.
2. Do not expose Reactor A-25 to rain.
3. If you need to move the machine, add
optional wheel kit.
4. Lift with hoist only from bar spanning across top of
cart.
Determine Power Source
Reactor A-25 can be wired to 3 types of power source:
• 230 Volt / 1 Phase
• 230 Volt / 3 Phase Delta (3 wire + ground PE)
• 380 Volt / 3 Phase WYE (4 wire + ground PE)
(220 Volts to Neutral)
Electrical Requirements
NOTE: Power cord is not supplied.
Improper wiring may cause electric shock or other
serious injury if work is not performed properly.
• Have a qualified electrician connect power and
ground to main power switch terminals and
ground lug.
• Ensure your installation complies with all National,
State, and Local safety and fire codes.
• Ensure that incoming power is disconnected and
locked out at the source.