Fluid Circulation
3A1569B 31
Circulation Through Gun
Manifold
Circulating fluid through the gun manifold allows rapid
preheating of hose.
1. Install gun fluid manifold (P) on accessory circula-
tion kit (CK). Connect high pressure circulation lines
(R) to circulation manifold.
2. Route circulation lines back to respective compo-
nent A or B supply drum. Use hoses rated at the
maximum working pressure of this equipment. See
manual for installation instructions.
3. Follow Initial Startup, page 21.
4. Turn main power ON .
5. Set temperature targets, see page 22. Turn on
, , and heat zones by pressing
.
6. Press to display actual temperatures.
7. Turn the air regulator to a low pressure until
and temperatures reach targets. Increase
the pressure once the temperatures are on target.
Do not circulate fluid containing a blowing agent
without consulting with your material supplier
regarding fluid temperature limits.
Table 1: Circulation Kit (CK)
Part Gun Manual
246362 Fusion AP 309818
256566 Fusion CS 313058
GC1703 Probler P2 313213
R
CK
P
ti2767a
The Fusion AP gun manifold is shown.
A
B
A
B