A SERVICE OF

logo

Operation
ConnectingConnecting
Connecting
thethe
the
BlastBlast
Blast
HoseHose
Hose
andand
and
AirAir
Air
HoseHose
Hose
1. Always purge the air supply hose 15–20 seconds
before connecting the air supply hose from the
compressor (or on-site compressed air source)
to the panel. Make sure all debris is cleared from
the hose.
2. Connect an appropriately sized air
supply hose to the air inlet. See
Technical Specications, page 45.
NOTE:NOTE:
NOTE:
Make sure to properly install hose
restraints and coupler pins to the quick-coupler
and the air line. If the holes on the quick-coupler
do not align, there is something wrong and the
two couplers are not compatible. DODO
DO
NOTNOT
NOT
TURNTURN
TURN
ONON
ON
THETHE
THE
AIRAIR
AIR
. Seek help to get the situation
resolved.
3. Open the air supply valve (125 psi, 8.6 Bar, 0.86
MPa maximum). If necessary, use a regulator in
the supply air line to meet these specications.
OFF
START
RUN
NOTE:NOTE:
NOTE:
Make sure the air supply meets
the appropriateappropriate
appropriate
airair
air
owow
ow
requirements.requirements.
requirements.
See
Technical Specications, page 45.
4. Connect the blast hose, hose restraints, control
hoses, and coupler pins.
ti24706a
NOTE:NOTE:
NOTE:
If you are using an electric blast control,
check all of the electrical connections from the
panel to the blast control.
NOTICENOTICE
NOTICE
Make sure no electrical connections will
be exposed to water. Exposure to water
could cause a short circuit and damage the
equipment.
10334667B