A SERVICE OF

logo

FIGURE 9
3/8 X 3"~
1/2 X 3"(~~
STEP 9:
¯ Swing the GUIDE RODS (9) under the TOP BOOM (2) as shown on FIGURE
¯
Assemble the TOP BOOM (2) over the GUIDE RODS (9) and SECURELY assemble the TOP BOOM (2) to the UPRIGHT
using two 1/2 X 3" BOLTS (28), two 1/2" WASHERS (29), and one 1/2" LOCK NUT (30). See FIGURE
¯
SECURELY assemble the TOP BOOM (2) to the top of the POWER RACK using two 3/8 X 3" BOLTS (26), four 3/8" WASH-
ERS (31), and two 3/8" LOCK NUTS (32). See FIGURE
¯ Screw the threaded end of the LAT CABLE (15) approximately 3/4" into the end of the WEIGHT STACK SHAFT (13) and tighten
jamnut securely. See FIGURE 9.