A SERVICE OF

logo

4
Fig. 4-a
A. Install a 1/2” NPT 90° hose barb fitting in the side
of the supplied water reservoir so that it points up.
B. Install a 1/2” NPT 90° hose barb into the bottom
hole of the reservoir pointing down.
C. Test fit the reservoir in the battery tray. Modify
tray as needed to eliminate sharp edges from
puncturing the reservoir. (See Fig. 4-a)
Section 4
Water Reservoir Assembly
4. Water Reservoir Assembly Installation
D. Secure the reservior using the original battery
hold-down clamp or other suitable method.