8
Unpacking
Remove crate from around machine and check
for shipping damage and ensure all parts are
intact. Report any damage immediately to your
distributor and shipping agent. Read the
instruction manual thoroughly for assembly,
alignment, maintenance and safety instructions.
Contents of crate:
1 panel saw
1 over arm
1 upper guard
2 blade guards
1 steel pin
1 crosscut table
1 mitre fence
1 arbor wrench
1 set hex wrenches
1 open-end wrench
2 extension tables
1 extension table leg
1 hardware bag
1 instruction manual
1 warranty card
Installation and Assembly
(NOTE: Consult the parts breakdowns at the
back of this manual if further clarification of
assembly process is needed.)
1. Lift the machine off the pallet with crane or
forklift, using a hoist. When the machine is
sitting on the ground, it can be lifted by
removing the side cover plate (Figure 2) and
sliding forks through the two openings.
2. When the machine has been placed in the
intended location, it must be leveled to
ensure the smooth motion of the sliding
table. Use a level on top the table, and
adjust any of the four bolts in the corners of
the base (Figure 3) as necessary.
3. The support arm and sliding table have both
been locked for transportation. Release the
support arm by lifting the lower lever (Figure
4). Release the sliding table by pushing in
the upper lever (Figure 4).
Figure 2
Figure 3
Figure 4