
Operation
4-6
Part 1061253B
E 2006 Nordson Corporation
Startup
NOTE: Refer to the Troubleshooting section if the
system faults during startup.
Locally Operated Units
Table 4-4 Startup Procedures for Locally Operated Units
Step Single Unit
Operated Locally
Multiple Units Networked to a Master Unit
Operated Locally
1 Switch the electrical disconnect enclosure to ON.
2 Turn the main power switch on the front of the power supply unit to the on position. The
power on message begins to scroll.
The power on message begins with the words UV CURING. Three numbers will then scroll
listing the software versions for the display board, main control board, and the phase board
respectively.
3 Make sure that all interlocked access doors are closed and that the exhaust fan is running if
not directly connected to the power supply blower contacts. If external interlocks are wired
and open, a fault message F LOCK will appear in the display.
4 On the NETWORK selector, press Local. Set the NETWORK configuration.
S On the master unit’s NETWORK selector,
press Local.
S On the remote units’ NETWORK
Selector, press Remote.
Continued...