Preparing for installation
Installation Planning Guide 4-5
Connectivity requirements
An Ethernet local area network (LAN) running Transmission
Control Protocol/Internet Protocol (TCP/IP), AppleTalk, or Novell
NetWare software is the network communication system used to
transport documents from the client workstation to the printing
system.
Ethernet specifications
The Ethernet connection to the controller processor must be
compatible with the Institute of Electrical and Electronics
Engineers (IEEE) 802.3 standard.
The Ethernet interface on the controller processor is a 10 Mb/sec
twisted pair standard (10BaseT and 100BaseT). Attachment Unit
Interface (AUI) Coax Ethernet is enabled with an adapter cable.
Install • Ensure supplies are available.
• Ensure system administrators are available
during software installation.
• Provide applicable completed worksheets from
the Getting Ready for Installation document.
If the NPS/IPS Extension option is being
installed, provide applicable information as
directed in the 96/4635/180 NPS/IPS Installation
Planning Guide.
• Install printing system hardware and software.
• Have operators available for training.
• Check documentation and software kits for
completeness.
• Have test jobs ready to run.
• Provide stocks needed for default input
configuration.
• Obtain and enable software license.
Customer
Customer
Customer
Xerox
Customer
Customer
Customer
Customer
Customer
_________
_________
_________
_________
_________
_________
_________
_________
_________
Post-
install
• Become familiar with support services available.
• Establish supplies maintenance procedure.
• Provide ongoing system maintenance.
• Adjust the printer alignment and magnification.
• Order additional documentation, as necessary.
Customer
Customer
Customer and Xerox
Xerox
Customer
_________
_________
_________
_________
_________
Table 4-1. Installation planning checklist (Continued)
Week Activity Responsibility
Date
completed