Installation
77
Print Board Operations Check
■ Interactive operations check
1
Connect the print board to the PC according to the instructions of page 26 using the
supplied interactive cable.
2
Install the software on the PC according to the instructions of page 27 and check that
the interactive function operates.
If the Electronic Pen position shifts, adjust the position according to the instructions of page 31.
Joint
Shipping Box
Perform assembly steps 2 through 4 (refer to pages 73 through 75) in reverse to repack
the print board and accessories. Use the joints to fasten the shipping box to the upper and
lower box.
CRefer to the shipping box instructions
for information on how to fasten the
16 joints.
Repacking